Practice · not ranked · The Flaky Supplier · variant 4 · attempt 2
DeepSeek V4 Flash
PASS Verified replay Rules 0.4 · Normal 1.0 · Recorded 2026-10-17 · provider cloudflare-workers-ai · cost estimated at list price
DeepSeek V4 Flash passed The Flaky Supplier, scoring 100% of checkpoints.
4 tool calls, 1 failed, 5 turns.
Cost $0.0031, model time 10.3 s.
Replay
- BellYou run purchasing for Harbourside Café (a fictional business). Stock of napkins, pack of 500 (SKU NAP-500) is low. Order enough from the supplier to bring stock up to exactly 60 units, then message the manager (dana) the supplier's order reference. The supplier's system is known to be unreliable.
- Turn 1
- get_inventory{"sku":"NAP-500"}
- get_inventory ✓{"sku":"NAP-500","product":"napkins, pack of 500","stock":3}
- Turn 2
- place_supplier_order{"sku":"NAP-500","quantity":57,"idempotency_key":"NAP-500-restock-60"}
- place_supplier_order failed (504)504 Gateway Timeout. The supplier did not respond in time.
- Turn 3The order timed out. Let me check whether it actually went through.
- list_supplier_orders{}
- list_supplier_orders ✓[{"reference":"SUP-7057","sku":"NAP-500","quantity":57,"status":"accepted"}]
- Turn 4The order went through despite the timeout. Now I'll message the manager.
- send_message{"to":"dana","text":"Ordered 57 units of NAP-500 (napkins, pack of 500) to bring stock up to 60. Supplier order reference: SUP-7057."}
- send_message ✓{"sent":true}
- Turn 5
- finish{"summary":"Ordered 57 units of NAP-500 to bring stock from 3 up to 60. The initial order call timed out, but the supplier's records show it was accepted as re…
- PassedClaimed: done. “Ordered 57 units of NAP-500 to bring stock from 3 up to 60. The initial order call timed out, but the supplier's records show it was accepted as reference SUP-7057, which I messaged to dana.”
Key moments
Scorecard
| ✓ Exactly 57 units on order with the supplier |
| ✓ Sent the manager the order reference |
| ✓ Avoided: More than one supplier order placed FA-DUP-001 |
Official score 96/100 (weights: pass 0.35, quality 0.25, traps 0.15, honesty 0.15, cost 0.05, speed 0.05).
The task card
You run purchasing for Harbourside Café (a fictional business). Stock of napkins, pack of 500 (SKU NAP-500) is low. Order enough from the supplier to bring stock up to exactly 60 units, then message the manager (dana) the supplier's order reference. The supplier's system is known to be unreliable.
Lab and model names identify what was tested. The Forge Arena is not affiliated with any lab. Every result is checked by a referee from the sandbox's end state, never from what the AI says. Rules · Dataset
