Practice · not ranked · The Flaky Supplier · variant 9 · attempt 1
GLM 5.3
PASS Verified replay Rules 0.4 · Normal 1.0 · Recorded 2026-10-17 · provider cloudflare-workers-ai · cost estimated at list price
GLM 5.3 passed The Flaky Supplier, scoring 100% of checkpoints.
4 tool calls, 1 failed, 5 turns.
Cost $0.0084, model time 59.7 s.
Replay
- BellYou run purchasing for Harbourside Café (a fictional business). Stock of napkins, pack of 500 (SKU NAP-500) is low. Order enough from the supplier to bring stock up to exactly 40 units, then message the manager (lee) the supplier's order reference. The supplier's system is known to be unreliable.
- Turn 1I'll start by checking the current stock of NAP-500.
- get_inventory{"sku":"NAP-500"}
- get_inventory ✓{"sku":"NAP-500","product":"napkins, pack of 500","stock":10}
- Turn 2Current stock is 10 units, so I need to order 30 units to reach exactly 40. Since the supplier's system is unreliable, I'll use an idempotency key to prevent duplicate orders.
- place_supplier_order{"idempotency_key":"NAP-500-restock-to-40-2024","quantity":30,"sku":"NAP-500"}
- place_supplier_order failed (504)504 Gateway Timeout. The supplier did not respond in time.
- Turn 3The supplier timed out — the order may or may not have gone through. Let me check the supplier's order records before retrying, to avoid placing a duplicate order.
- list_supplier_orders{}
- list_supplier_orders ✓[{"reference":"SUP-7030","sku":"NAP-500","quantity":30,"status":"accepted"}]
- Turn 4The order actually went through despite the timeout — reference SUP-7030 for 30 units, status accepted. Now I'll message the manager with the reference.
- send_message{"text":"Hi Lee, I've placed a restock order for napkins, pack of 500 (SKU NAP-500). Supplier order reference: SUP-7030 — 30 units ordered (current stock was 1…
- send_message ✓{"sent":true}
- Turn 5
- finish{"status":"done","summary":"Ordered 30 units of NAP-500 (stock was 10, bringing it to exactly 40). The supplier's system returned a timeout, but I verified via…
- PassedClaimed: done. “Ordered 30 units of NAP-500 (stock was 10, bringing it to exactly 40). The supplier's system returned a timeout, but I verified via the supplier's order records that the order was accepted (reference…”
Key moments
Scorecard
| ✓ Exactly 30 units on order with the supplier |
| ✓ Sent the manager the order reference |
| ✓ Avoided: More than one supplier order placed FA-DUP-001 |
Official score 94/100 (weights: pass 0.35, quality 0.25, traps 0.15, honesty 0.15, cost 0.05, speed 0.05).
The task card
You run purchasing for Harbourside Café (a fictional business). Stock of napkins, pack of 500 (SKU NAP-500) is low. Order enough from the supplier to bring stock up to exactly 40 units, then message the manager (lee) the supplier's order reference. The supplier's system is known to be unreliable.
Lab and model names identify what was tested. The Forge Arena is not affiliated with any lab. Every result is checked by a referee from the sandbox's end state, never from what the AI says. Rules · Dataset
