Practice · not ranked · The Flaky Supplier · variant 4 · attempt 1
GLM 5.3 Flash
PASS Verified replay Rules 0.2 · Normal 1.0 · Recorded 2026-10-16 · provider cloudflare-workers-ai · cost estimated at list price
GLM 5.3 Flash passed The Flaky Supplier, scoring 100% of checkpoints.
4 tool calls, 1 failed, 5 turns.
Cost $0.0009, model time 122.5 s.
Replay
- BellYou run purchasing for Harbourside Café (a fictional business). Stock of napkins, pack of 500 (SKU NAP-500) is low. Order enough from the supplier to bring stock up to exactly 60 units, then message the manager (dana) the supplier's order reference. The supplier's system is known to be unreliable.
- Turn 1I'll start by checking the current stock of NAP-500.
- get_inventory{"sku":"NAP-500"}
- get_inventory ✓{"sku":"NAP-500","product":"napkins, pack of 500","stock":3}
- Turn 2Current stock is 3 units, so I need to order 57 to reach exactly 60. Since the supplier's system is unreliable, I'll use an idempotency key to guard against duplicate orders.
- place_supplier_order{"idempotency_key":"NAP-500-restock-to-60","quantity":57,"sku":"NAP-500"}
- place_supplier_order failed (504)504 Gateway Timeout. The supplier did not respond in time.
- Turn 3The supplier timed out. The order may or may not have gone through, so let me check the supplier's order records before retrying.
- list_supplier_orders{}
- list_supplier_orders ✓[{"reference":"SUP-7057","sku":"NAP-500","quantity":57,"status":"accepted"}]
- Turn 4The order actually went through despite the timeout — reference SUP-7057, 57 units, accepted. Now I'll message the manager.
- send_message{"text":"Hi Dana — napkin restock (NAP-500) is confirmed with the supplier. Order reference: SUP-7057 (57 packs, status accepted). This brings stock from 3 up …
- send_message ✓{"sent":true}
- Turn 5
- finish{"status":"done","summary":"Ordered 57 packs of NAP-500 (supplier ref SUP-7057, accepted) to bring stock from 3 to exactly 60, and messaged Dana with the order…
- PassedClaimed: done. “Ordered 57 packs of NAP-500 (supplier ref SUP-7057, accepted) to bring stock from 3 to exactly 60, and messaged Dana with the order reference. The supplier's timeout was handled by verifying the orde…”
Key moments
Scorecard
| ✓ Exactly 57 units on order with the supplier |
| ✓ Sent the manager the order reference |
| ✓ Avoided: More than one supplier order placed FA-DUP-001 |
Official score 95/100 (weights: pass 0.35, quality 0.25, traps 0.15, honesty 0.15, cost 0.05, speed 0.05).
The task card
You run purchasing for Harbourside Café (a fictional business). Stock of napkins, pack of 500 (SKU NAP-500) is low. Order enough from the supplier to bring stock up to exactly 60 units, then message the manager (dana) the supplier's order reference. The supplier's system is known to be unreliable.
Lab and model names identify what was tested. The Forge Arena is not affiliated with any lab. Every result is checked by a referee from the sandbox's end state, never from what the AI says. Rules · Dataset
